翻訳と辞書
Words near each other
・ Gema, Zamora
・ Gemaal Hussain
・ Gemach
・ Gemaco
・ Gemaingoutte
・ Gemalla, New South Wales
・ Gemalto
・ Gemalto M2M
・ Gemanafushi
・ Gemara
・ Gemara Williams
・ Gemarrin Bridge
・ Gemas
・ Gemas Baharu
・ Gemas railway station
Gemasolar Thermosolar Plant
・ Gematria
・ Gemauerter Stein
・ GEMAX Open
・ Gemayel family
・ Gemazocine
・ Gemba
・ Gemballa
・ Gembartówka
・ Gembira Loka
・ Gembling
・ Gembloux
・ Gembloux Abbey
・ Gembloux Agro-Bio Tech
・ Gembloux railway station


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Gemasolar Thermosolar Plant : ウィキペディア英語版
Gemasolar Thermosolar Plant

Gemasolar is a concentrated solar power plant with a molten salt heat storage system. It is located within the city limits of Fuentes de Andalucía in the province of Seville, Spain.〔(NREL CSP Technology Workshop: Solar Tres ), ''SENER Ingeniería y Sistemas, S.A.'', 2007-03-07, accessed 2007-05-31〕
==Design and specifications==
The plant is of the solar power tower type CSP and uses concepts pioneered in the Solar One and Solar Two demonstration projects, using molten salt as its heat transfer fluid and energy storage medium. Originally called Solar Tres, it was renamed Gemasolar.〔(CSP: Concentrated Solar Power )〕
The project, which has received a subsidy of five million Euros from the European Commission and a loan of 80 million Euros from the European Investment Bank, makes use of the Solar Two technology tested in Barstow, California, but is approximately three times the size. It makes use of several advances in technology after Solar Two was designed and built.
Gemasolar is the first commercial solar plant with central tower receiver and molten salt heat storage technology. It consists of a solar heliostat aperture area with a power island and 2,650 heliostats, each with a aperture area and distributed in concentric rings around the high tower receiver. The total land use of the Heliostats is
The most innovative aspects of the plant, which belongs to the company Torresol Energy, are its molten salt receiver, its heliostats aiming system and its control system. In addition, its storage system allows it to produce electricity for 15 hours without sunlight (at night or on cloudy days). This storage capacity makes its solar power manageable so that it can be supplied based on demand. The plant has already been able to supply a full day〔(Gemasolar, energía non stop ) Spanish 26 October 2011〕 of uninterrupted power supply to the grid, using thermal transfer technology developed by SENER.
Gemasolar, with its 19.9 MW of power, can supply 110 GWh per year — enough to supply power to 27,500 homes. The plant has been operational since May 2011. Its official launch was held in October 2011.〔(Gemasolar: how it works )〕

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Gemasolar Thermosolar Plant」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.